Guides
How to write a ship log people actually read
A ship log is not an announcement. It is a short record of what you shipped, what it does, and what you learned.
A ship log starts with the thing itself. Say what you shipped in one sentence, then show it: attach a screenshot of the thing working. A screenshot is the proof — add a live link too if the work is live online, so anyone can open it.
Next, say what changed. Did you launch a first version, fix something users complained about, or cut a step out of a workflow? One concrete change beats a list of adjectives.
Then write down one lesson. What surprised you, what took longer than expected, or what would you do differently next time? Lessons are why other builders read ship logs — they are the part that saves someone else an afternoon.
Keep it short. A good ship log fits on one screen: what shipped, the screenshot, what changed, one lesson. If a reader has to scroll to find the screenshot, the log is too long.